What an industrial defit removes
Sheds accumulate a different kind of fitout. Pallet racking bolted to the slab. Mezzanine floors. An office pod built inside the shed with its own aircon and lighting. Three-phase drops to machinery positions. Compressed air lines. Epoxy floor coatings. Bollards, guardrails and line marking. Sometimes a cool room or a spray booth.
Most of it is bolted or chemically anchored to the slab, which means the defit is as much about the holes as the items. A slab with two hundred cut-off anchor bolts is not made good.

The elements
- Racking and shelving. Unbolted, dismantled and removed. Often resold or recycled as steel.
- Mezzanines. Structural steel, decking, stairs and balustrades. Larger mezzanines may have needed building approval to install and their removal should be checked against that.
- Internal offices. Framed rooms inside the shed, with their own ceilings, aircon, lighting and data. A small office defit inside a large shed.
- Services. Three-phase drops, sub-boards, compressed air, extraction. All isolated and capped by licensed trades.
- Floor. Anchor bolts ground flush, holes filled, epoxy coating removed or repaired as the lease requires, line marking removed.
- External. Signage, bollards, bin enclosures, hardstand items.
Slab repair
Industrial leases are increasingly specific about the slab. Anchor bolts cut flush and holes epoxy-filled is the usual minimum. Some require the surface ground and recoated where racking sat. Some ask for the floor returned to the original coating, which can mean recoating the whole footprint.
It is worth photographing the slab before any racking goes in, because floor damage from forklift traffic is the item landlords most often try to include in a tenant's make good, and a dated photo is the only defence.
Mezzanine approvals
A mezzanine of any size usually needed building approval to install. Removing it is generally simpler, but where the mezzanine was part of an approved fire strategy for the building, or where it carried services, the removal may need a certifier's involvement. Worth raising with the landlord before assuming it is straightforward.
Access and timing
Industrial estates are the easiest access on the Coast: roller doors, hardstand, no lifts. The constraints are neighbouring tenancies and the estate's hours. A shed defit with racking, a mezzanine and an internal office is typically one to two weeks including slab repair.
Check your lease and the current law before you rely on this
This page describes Queensland commercial lease obligations and defit practice in general terms as they stood in September 2026. The law changes, leases differ, and what applies to you is in your lease.
The statutory position is in the Property Law Act 2023 and, for retail premises, the Retail Shop Leases Act 1994, both at legislation.qld.gov.au. The Queensland Small Business Commissioner publishes a make-good factsheet and offers mediation. Business Queensland covers ending a lease. Building work licensing sits with the Queensland Building and Construction Commission. Where anything here differs from those sources or from your lease, they are right and we are not.
We are not lawyers, property managers or certifiers. For what your lease requires and whether it can be negotiated, get legal advice.