Stripped back to the condition your lease requires, photographed at every stage.
Offices, shops, warehouses and hospitality tenancies. One contractor, one quote, one handover.
Address, roughly how many square metres, what is in there now, and what the lease says it has to be handed back as. That is usually enough for a price. If you have the make-good clause handy, even better.
The lease end date matters more than anything else. Work backwards from it, because a landlord holding your bond does not extend deadlines.
A make good is the tenant's obligation to hand the premises back in the condition the lease specifies. In Queensland that is now backed by standard terms in the Property Law Act 2023, so even a lease that says little about it carries an obligation. The landlord holds your bond or bank guarantee until it is done, and can draw on it if it is not.
The work itself is straightforward: partitions out, ceilings and floors dealt with, services capped, walls patched and painted, rubbish gone. What catches people is the sequencing. The lease ends on a fixed date. The defit needs a week or two. Trades need booking. The landlord's agent needs to inspect. If any of that starts late, you are paying holdover rent on a tenancy you have already left.
So the useful first question is not what it costs. It is what the lease actually says, and how many weeks you have.

Most of them come with a date attached, which is why this is rarely a leisurely job.
Most defits are a combination. Each page explains what is involved, what the lease is likely to require, and what tends to drive the price.
Partitions, ceilings, floors, kitchenettes and cabling, back to base building.
Read more →Shopfitting, feature walls, counters, signage and flooring in shopping strips and centres.
Read more →Mezzanines, racking, offices within sheds, and epoxy floors.
Read more →Cafes, restaurants and bars: counters, kitchens, exhaust and the plumbing behind them.
Read more →Patching, painting, ceiling tiles, skirting and reinstatement once the strip out is done.
Read more →Glass and plasterboard partitions, suspended ceilings, bulkheads and the framing behind them.
Read more →Carpet tiles, broadloom, vinyl, timber and tiles, and the adhesive underneath.
Read more →Cabinets, benches, sinks and built-in joinery, with the plumbing capped behind.
Read more →Electrical, data, plumbing and gas made safe by licensed trades before handover.
Read more →Fascia, pylon, window and internal signage removed and the surface made good.
Read more →Where the material goes, what gets recycled, and why it is a line on the quote.
Read more →What moves the price, and what a quote should itemise so two can be compared.
Read more →Three things about the Coast shape how defits run here.
The building stock. A lot of Coast commercial space is 2000s strata-titled suites in Maroochydore, Kawana and Noosaville, where the base building is a bare concrete shell with a ceiling grid and not much else. "Original condition" in those buildings often means genuinely bare, which is a bigger defit than tenants expect.
The turnover. Hospitality and retail tenancies here change hands fast, particularly through Mooloolaba, Noosa Junction and the Caloundra strips. A high turnover market means landlords have a next tenant waiting and no appetite for a slow handover.
Access. Strata buildings and shopping centres control loading docks, lifts and after-hours access. A defit that assumes it can start Monday morning and runs into a body corporate's contractor induction is a defit that starts Wednesday.
Practical consequence: the timeline needs a week of contingency on top of the work itself, and the access conversation needs to happen before the quote is accepted.

Areas covered:
Worth knowing before you get quotes, because it tells you what to ask. A small office is a few days. A full hospitality strip out to cold shell is a week or two, plus trades.
The make-good clause defines the scope. The condition report from the start of the lease, if one exists, defines the finish line. Everything else follows from those two documents.
Before anything is quoted, what "make good" means for this tenancy gets confirmed with the landlord or their agent in writing. This is the step that prevents the dispute.
Itemised by element: partitions, ceilings, floors, joinery, services, repairs, waste. With dates that work backwards from the handover.
Licensed electrician, plumber and data contractor cap and isolate before demolition starts. Nothing gets pulled out live.
Joinery, partitions, ceilings and floors in an order that protects the base building. Material sorted and removed as it comes out.
Patching, painting and reinstatement to the agreed scope. Photographed throughout. Walk-through with the agent, keys back, bond released.
A commercial bond or bank guarantee on the Sunshine Coast is commonly several months' rent. The landlord holds it until the premises are handed back to the standard the lease requires, and under Queensland law can draw on it without going to court if the tenant does not meet the obligation.
That makes the make good a financial event rather than a cleaning job. Do it properly and on time, and the bond comes back. Do it badly, late or not at all, and the landlord does it at your cost, usually a higher cost, and takes it from the guarantee.
The single thing that most protects a tenant is a condition report from the start of the lease. Without one, "original condition" is whatever the landlord says it was. With one, it is a document.
This page describes Queensland commercial lease obligations in general terms as they stood in September 2026. The law changes, and what applies to you is in your lease.
The statutory position is in the Property Law Act 2023 and, for retail premises, the Retail Shop Leases Act 1994. The Queensland Small Business Commissioner publishes a plain-English make-good factsheet and offers mediation. Business Queensland covers ending a lease. Where anything here differs from those sources or from your lease, they are right and we are not.
We are not lawyers or property managers. For what your lease requires and whether you can negotiate it, get legal advice.
Accurate at the time of writing, September 2026. Always check the source before relying on it.
A defit is quoted off what is in the tenancy and what the lease says has to come out. Describe both and a realistic range is usually possible before anyone visits.
| Factor | Why it matters |
|---|---|
| What the lease requires | Cold shell, warm shell or original condition are three different jobs. This is the biggest variable and it is set by the lease, not by you. |
| Floor area | The base measure. A 120 sqm suite and a 600 sqm floor scale predictably. |
| Fitout density | An open plan office with a kitchenette is quick. A medical suite with six rooms, plumbing in each and lead-lined walls is not. |
| Services | Every capped point needs a licensed trade. Kitchens, bathrooms and server rooms have many. |
| Floor finish | Carpet tiles lift easily. Glued-down vinyl and tiled floors take grinding, and the adhesive has to come off too. |
| Make-good repairs | Patching and painting to a lease standard is real work. Some leases require new carpet and ceiling tiles. |
| Access | Ground floor with a loading bay is easy. Level 8 in a strata building with a shared lift and after-hours rules is not. |
| Waste | Tipping fees are real and rising. Sorted recycling reduces them. Asbestos in older buildings changes everything. |
When you compare quotes, check whether make-good repairs and services capping are included. A cheap quote is usually a strip-out-only quote, and the landlord will not accept a strip-out as a make good.
A defit is the physical strip out: removing the fitout. A make good is the lease obligation to hand the premises back in a specified condition, which usually includes the defit plus repairs, painting and reinstatement. You can do a defit without meeting the make good. You cannot usually meet the make good without a defit.
A small office with a kitchenette is typically a few days. A full hospitality strip out to cold shell is one to two weeks plus trades and make-good repairs. Add a week of contingency for access and inspections. Start the conversation eight to ten weeks before the lease ends, not four.
Whatever the premises were like when you took the lease, allowing for fair wear and tear. If there is a condition report from the start, that defines it. If there is not, it becomes a negotiation, and that is where most disputes begin.
In Queensland, commercial leases now carry standard terms under the Property Law Act 2023 requiring the premises to be returned in the same or better condition, unless the lease says otherwise. So a silent lease does not mean no obligation. Get advice on your specific lease.
Often, yes. Some landlords prefer a payment to the works, particularly if the next tenant will refit anyway. A contractor's itemised quote is the number that negotiation happens around, so getting one is useful even if you never do the work.
Licensed trades do, as part of the job. Electrical, plumbing, gas and data are isolated and capped before demolition and certified where required. It is not something a demolition crew does on its own, and it should be a named item in the quote.
Build it into the program. The agent needs to walk through before keys are returned and there needs to be time to fix anything they raise. A handover the day the lease ends leaves no room for that.
Older Coast buildings, particularly pre-1990 shops and sheds, may. A defit that disturbs it needs a licensed asbestos removalist and a clearance certificate before other work continues. It changes cost and timeline significantly, so raise it early if the building is old.
Address, rough size, what is in there, and when the lease ends. That is usually enough for a price without anyone visiting.