Office defit on the Sunshine Coast

Partitions, ceilings, floors, kitchenettes and cabling taken back to base building, in the order that protects the landlord's fabric and your bond.

What an office defit removes

An office defit strips out everything the tenant added and returns the suite to base building: the shell the landlord leased. On a typical Sunshine Coast office that means glass and plasterboard partitions, meeting rooms, the kitchenette, any built-in joinery, data cabling, feature lighting, floor coverings if the lease requires, and signage. What stays is the structure, the base ceiling grid, the fire services and whatever the lease defines as the landlord's.

The line between tenant fitout and base building is the whole job. Get it wrong one way and you have removed something the landlord owned. Get it wrong the other and you have left something the lease says must go.

Base building is not a feeling. It is whatever the condition report and the lease say it is.

Sequence

  1. Services isolated. Licensed electrician and data contractor cap and make safe. Kitchenette plumbing capped by a licensed plumber. Nothing is demolished live.
  2. Joinery and loose fitout. Kitchenette, reception desk, built-in storage, whiteboards, blinds if the lease requires.
  3. Partitions. Glass and plasterboard walls out, framing out, head and floor tracks removed, fixings pulled from the slab and ceiling grid.
  4. Ceilings. Feature ceilings and bulkheads removed. The base grid usually stays. Tiles damaged during the fitout replaced if the lease requires.
  5. Floors. Carpet tiles lifted, adhesive dealt with, slab left clean. Or floors left, if the lease says so.
  6. Make good. Wall patching where partitions were fixed, painting, ceiling tile replacement, skirting.
  7. Clean and photograph. Builders clean, then a full photo set before the agent's inspection.
Empty open-plan office with workstations removed, carpet tiles half lifted showing bare concrete and cable trays hanging from the ceiling grid
Mid-defit. Partitions out, floor half lifted, services capped above

What the lease usually asks for

Office leases on the Coast tend to fall into three patterns, and the difference between them is the difference between a three day job and a two week one.

  • Remove tenant fitout, make good damage. Partitions and joinery out, walls patched and painted, floors left. The most common and the cheapest.
  • Return to original condition. Whatever the condition report shows from lease start, which may include the previous tenant's carpet and ceiling being reinstated. Depends entirely on that report.
  • Return to cold shell or base building. Everything out including floor coverings, ceiling, sometimes lighting. Common in newer strata suites where the landlord leased a bare shell.

The lease decides. If it is unclear, that gets confirmed with the landlord in writing before the quote, not argued about after the work.

Strata buildings

A lot of Sunshine Coast office space is strata-titled suites in Maroochydore, Kawana, Birtinya and Noosaville. That adds a layer: the body corporate controls the lift, the loading dock, after-hours access and contractor induction, and the by-laws often restrict noisy work to certain hours.

A defit in a strata building needs those arrangements made before the start date, or the first day is spent waiting at a locked dock. It is worth asking the property manager for the building's contractor rules when you get the first quote.

Timing

A single suite with a kitchenette and a few partitions is typically three to five working days including make-good repairs. A full floor with meeting rooms, a boardroom and a server room is one to two weeks plus trades. Add a week for the agent's inspection and any items they raise.

Work backwards from the lease end. Ten weeks out is comfortable. Six is tight. Four means paying holdover rent while the work finishes.

Written September 2026

Check your lease and the current law before you rely on this

This page describes Queensland commercial lease obligations and defit practice in general terms as they stood in September 2026. The law changes, leases differ, and what applies to you is in your lease.

The statutory position is in the Property Law Act 2023 and, for retail premises, the Retail Shop Leases Act 1994, both at legislation.qld.gov.au. The Queensland Small Business Commissioner publishes a make-good factsheet and offers mediation. Business Queensland covers ending a lease. Building work licensing sits with the Queensland Building and Construction Commission. Where anything here differs from those sources or from your lease, they are right and we are not.

We are not lawyers, property managers or certifiers. For what your lease requires and whether it can be negotiated, get legal advice.

Accurate at the time of writing, September 2026. Always check the source before relying on it.

Questions

Common questions

What is base building?

The shell the landlord leased before the tenant's fitout: structure, base ceiling grid, fire services and whatever else the lease and condition report define as the landlord's. Everything the tenant added is fitout and comes out.

Do the floors have to come up?

Only if the lease says so. Many office leases leave floors in place with damage made good. Cold shell or base building leases require them out, adhesive and all. Read the clause.

How long does an office defit take?

A single suite is three to five working days including repairs. A full floor is one to two weeks plus trades. Allow another week for the agent's inspection and any items raised.

Who caps the electrical and data?

Licensed trades, as the first step before any demolition. It is a named item on the quote and it is not something a demolition crew does on its own.

What about a strata building?

The body corporate controls lifts, loading docks, after-hours access and induction. Those need arranging before the start date. Ask the property manager for the contractor rules when you get quotes.

Can we leave the partitions if the next tenant wants them?

Sometimes, if the landlord agrees in writing. Some landlords prefer a partial defit or a cash settlement when the incoming tenant will reuse the fitout. It has to be documented or the make-good obligation stands.

What if there is no condition report from the start?

Then original condition becomes a negotiation, and that is where most disputes begin. Photograph everything before work starts, agree the scope with the landlord in writing, and get advice if the landlord's expectation seems beyond the lease.

When should we start?

Eight to ten weeks before the lease ends. Six is tight. Inside four you are likely paying holdover rent while the work finishes.

Next step

Send the tenancy and the date

Address, rough size, what is in there, and when the lease ends. That is usually enough for a price without anyone visiting.