The strip out is not the make good
A tenancy with the partitions gone, the joinery out and the floor lifted is not handed back. It is a construction site. The make good is what happens next: every hole where a partition was fixed patched and sanded, walls painted to a consistent finish, ceiling tiles that were cut or stained replaced, skirting reinstated, floors cleaned to slab or recarpeted if the lease requires, and the whole thing left as a space a landlord can show the next tenant.
This is the part cheap quotes leave out, and it is the part the agent inspects.

What make good usually covers
- Wall repairs. Fixing holes, partition tracks, screw holes, sign fixings, cable penetrations. Filled, sanded, sealed.
- Painting. To a uniform finish, usually the base building colour, usually whole walls rather than patch-painting because patches show.
- Ceilings. Damaged, cut or stained tiles replaced. Grid straightened where partitions were fixed to it. Bulkhead removal made good.
- Floors. Adhesive removed, slab cleaned, or new carpet or vinyl laid if the lease requires.
- Skirting and trims. Reinstated where removed with the fitout.
- Doors and hardware. Base building doors reinstated, tenant locks removed and landlord keys returned.
- Lighting. Base building lighting reinstated where feature lighting replaced it. Tubes and fittings working.
- Cleaning. Builders clean including windows, so the space presents.
To what standard
The lease sets it, and the words matter. "Good and tenantable repair" is the general Queensland standard. "Original condition" means the condition report. "Base building standard" means the landlord's specification. Some leases go further and require new carpet, new paint throughout and new ceiling tiles regardless of condition.
The one thing every standard excludes is fair wear and tear. Faded paint from ten years of sun through a Coast window is not the tenant's to fix. Fifty fixing holes are.
Painting properly
Patch-painting shows. A wall with twenty fresh patches of a slightly different white looks worse than an untouched wall, and it is the most common reason an agent asks for a repaint. Make good painting is usually full walls, sometimes full rooms, in the base building colour, with the correct sheen. It costs more than touching up and it is what gets signed off.
Sequence with the strip out
Repairs happen after demolition and before the clean, and they need the trades to have finished first. A wall patched before the electrician has pulled the last cable will be patched twice. Good programming has the make good starting as the last of the strip out finishes, not after.
Check your lease and the current law before you rely on this
This page describes Queensland commercial lease obligations and defit practice in general terms as they stood in September 2026. The law changes, leases differ, and what applies to you is in your lease.
The statutory position is in the Property Law Act 2023 and, for retail premises, the Retail Shop Leases Act 1994, both at legislation.qld.gov.au. The Queensland Small Business Commissioner publishes a make-good factsheet and offers mediation. Business Queensland covers ending a lease. Building work licensing sits with the Queensland Building and Construction Commission. Where anything here differs from those sources or from your lease, they are right and we are not.
We are not lawyers, property managers or certifiers. For what your lease requires and whether it can be negotiated, get legal advice.
Accurate at the time of writing, September 2026. Always check the source before relying on it.